Kurva Jadwal Pelaksanaan Pekerjaan
Info Pekerjaan
INFO KEGIATAN
Nama Unit Kerja | UPT WILAYAH SELATAN |
---|---|
Rek DPA | |
Nama Program | Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor |
Nama Kegiatan | Anak Hekter / Isi Steaples Etona No. 3 (24/6)| Anak Hekter besar (Uk. 10) | Binder Klip Kenko No. 107| Binder Klip Kenko No. 111| Binder Klip Joyko No. 155| Binder Klip Joyko No. 200| Buku Folio Merk Okey ( 200 lembar)| Buku Ekspedisi Standar Karto |
Total DPA | Rp36.192.105,00 |
Keterangan | BELANJA ALAT TULIS KANTOR (Anak Hekter / Isi Steaples Etona No. 3 (24/6) | Anak Hekter besar (Uk. 10) | Binder Klip Kenko No. 107| Binder Klip Kenko No. 111|Binder Klip Joyko No. 155|Binder Klip Joyko No. 200| Buku Folio Merk Okey ( 200 lembar)| Buku Ekspedisi Standar Karton (180lbr) | Gunting Gunindo Besar | Steaples (Hekter) Joyko HD-50 | Steaples (Hekter) Joyko HD- 10| Lem Kertas Fox Stik (60gr)Lem Kertas Fox Botol (500gr) |Lem UHU Ukuran 35 ml |Map folio D Negeri | Map Odner Folio Merk Gung Yu | Map Plastik Folio kancing | Klip Kertas / paper klip Atom No.5 | Klip Kertas / paper klip Atom No.3| Pelobang Kertas| Penghapus Pinsil Joyko ER-30| Pensil 2B Faber Castel| Pisau Cutter Joyko L-500| Pulpen Balliner Standard Elite | Pulpen Gel Kenko Easy Gel | Pena Snowman BP-7 |Rautan Pensil | Isolasi/Lakban/Selotif Bening Daimaru 2" | Isolasi/Lakban/Selotif Dainaru 24mm | Isolasi/Lakban/Selotif Kain SKS 48mmx10m | Isolasi/Lakban/Selotif Linen Hitam (45mm x 10mm) | Spidol Hitam Non Permanen Warna Hitam | Penggaris besi Kenko 30 cm | Letter File | Papan tulis putih | Post-it | Stabilo | Tinta Stempel | Tipe-Ex Pen | Tipe-EX Kertas |
INFO KONTRAK
Nomor Kontrak | 3/Pesanan/UPT.Selatan/SDABMBK/III/2025 |
---|---|
Tanggal Kontrak | 04-03-2025 |
Metode Pelaksanaan | Pengadaan langsung |
Tanggal Mulai Pelaksanaan | 04-03-2025 |
Tanggal Selesai Pelaksanaan | 29-04-2025 |
Total Kontrak | Rp36.192.105,00 |
Target Output | - |
INFO PENYEDIA
Nama Penyedia | CV. LENTERA ALFATIH |
---|---|
Alamat Penyedia | JL. JERMAL XII GG. KELUARGA MEDAN DENAI |
Hari 1 [2025-04-29]
Target: 100,00 %
Realisasi Pelaksanaan: 100,00 %
Deviasi: Sesuai target, Deviasi 0 %