Kurva Jadwal Pelaksanaan Pekerjaan

Info Pekerjaan

INFO KEGIATAN

Nama Unit Kerja UPT WILAYAH SELATAN
Rek DPA
Nama Program Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor
Nama Kegiatan Anak Hekter / Isi Steaples Etona No. 3 (24/6)| Anak Hekter besar (Uk. 10) | Binder Klip Kenko No. 107| Binder Klip Kenko No. 111| Binder Klip Joyko No. 155| Binder Klip Joyko No. 200| Buku Folio Merk Okey ( 200 lembar)| Buku Ekspedisi Standar Karto
Total DPA Rp36.192.105,00
Keterangan BELANJA ALAT TULIS KANTOR (Anak Hekter / Isi Steaples Etona No. 3 (24/6) | Anak Hekter besar (Uk. 10) | Binder Klip Kenko No. 107| Binder Klip Kenko No. 111|Binder Klip Joyko No. 155|Binder Klip Joyko No. 200| Buku Folio Merk Okey ( 200 lembar)| Buku Ekspedisi Standar Karton (180lbr) | Gunting Gunindo Besar | Steaples (Hekter) Joyko HD-50 | Steaples (Hekter) Joyko HD- 10| Lem Kertas Fox Stik (60gr)Lem Kertas Fox Botol (500gr) |Lem UHU Ukuran 35 ml |Map folio D Negeri | Map Odner Folio Merk Gung Yu | Map Plastik Folio kancing | Klip Kertas / paper klip Atom No.5 | Klip Kertas / paper klip Atom No.3| Pelobang Kertas| Penghapus Pinsil Joyko ER-30| Pensil 2B Faber Castel| Pisau Cutter Joyko L-500| Pulpen Balliner Standard Elite | Pulpen Gel Kenko Easy Gel | Pena Snowman BP-7 |Rautan Pensil | Isolasi/Lakban/Selotif Bening Daimaru 2" | Isolasi/Lakban/Selotif Dainaru 24mm | Isolasi/Lakban/Selotif Kain SKS 48mmx10m | Isolasi/Lakban/Selotif Linen Hitam (45mm x 10mm) | Spidol Hitam Non Permanen Warna Hitam | Penggaris besi Kenko 30 cm | Letter File | Papan tulis putih | Post-it | Stabilo | Tinta Stempel | Tipe-Ex Pen | Tipe-EX Kertas

INFO KONTRAK

Nomor Kontrak 3/Pesanan/UPT.Selatan/SDABMBK/III/2025
Tanggal Kontrak 04-03-2025
Metode Pelaksanaan Pengadaan langsung
Tanggal Mulai Pelaksanaan 04-03-2025
Tanggal Selesai Pelaksanaan 29-04-2025
Total Kontrak Rp36.192.105,00
Target Output -

INFO PENYEDIA

Nama Penyedia CV. LENTERA ALFATIH
Alamat Penyedia JL. JERMAL XII GG. KELUARGA MEDAN DENAI

Hari 1 [2025-04-29]

Target: 100,00 %

20% Complete

Realisasi Pelaksanaan: 100,00 %

20% Complete

Deviasi: Sesuai target, Deviasi 0 %

20% Complete

PETA LOKASI